New TopShim run:

version = topshim 2.0.0
date = 2023-01-29
time = 18:39:01.598
command = topshim 

FINE SHIMMING

Parameters:

probe = Z136881_0010
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.1 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  3: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  5: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  6: FWHM Before= 0.5 Hz, Target= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.526

shim changes: 
Z	-347
Z2	+508
Z3	-365
Z4	+3931
Z5	-6425

duration = 7 min 4 sec
completed successfully
finished Sun Jan 29 18:46:04 2023


========================================================================